How to Select a Solar Electric Contractor
Select a Solar Electric Contractor - Qualifications
Select a Solar Electric Contractor - Site Assessment
Select a Solar Electric Contractor - Proposals and Contracts
Select a Solar Electric Contractor - Permits and Rebates
Select a Solar Electric Contractor - Installation and Commissioning
New Light Bulbs Measure In Lumens Instead Of Watts
Lighting With Compact Florescent Lamps
Lighting With Halogen Incandescent Bulbs
Energy Efficient Light Bulbs
Lighting With LEDs
Understanding Lighting Labels
How To Repurpose Items For Functional Decor
Make The Best Use Of Storage Space
Plan A Stress Free Remodel
Add Functional Indoor Lighting To Your Home
Increase Home Value With Remodeling
Buying Energy Efficient Electronics
The SolarWorld group is one of the world’s largest solar energy businesses. SolarWorld’s family of companies dedicates itself exclusively to the business of solar energy, combining all stages of the photovoltaic value chain, from the raw material silicon to turn-key solar power plants. SolarWorld operates production facilities in the USA and Germany as well as sales offices around the world.
http://solarworld-usa.com/solar-for-home.aspx
http://solarworld-usa.com/contact.aspx
Select a Solar Electric Contractor - Installation and Commissioning
SolarWorld Authorized Installer Keith Knowles discusses the final steps in the solar installation process and what to expect once the system is installed and activated.
Transcripts
Keith Knowles: Hi! I am Keith Knowles. I am a licensed Solar Contractor and an authorized installer for SolarWorld, America's largest manufacturer of PV Modules. Today we are going to learn how to select your solar contractor and we will be covering the steps of installation and commissioning. So let's go find out more.
The first thing that goes on your roof is the racking. Some installers sub this step out to a roofer in order to maintain your roof warranty. Others are qualified to do it themselves. This is usually the most time-consuming part of the process. Next, the solar panels go on. It's not a bad idea to look at the back of the panel to ensure that it's the make and model specified in your contract. The inverter will be mounted in the garage or a shady spot on an outside wall. The solar panels get wired into here. The inverter output is wired to your electrical panel. It will also get some new labels. Once this is done and tested, your contractor will schedule any final inspections required by the authority having jurisdiction, usually the local code inspector. Sometimes your utility may also send an inspector to make sure everything is up to their standards. Before making the final payment to your contractor, you should have assurance that your system was successfully commissioned and is now working. You also want to make sure that any open issues you brought up with the contractor have been resolved. Most contractors will have developed a punch list with you and will be more than happy to show you that everything has been completed.
Except for inverter service in 10 to 15 years and an occasional washing of your panels, your system will be maintenance-free for 25 to 30 years.
How to Select a Solar Water Heater
Understanding a Solar Electric System
What is a Solar Electric System?
Solar Electric System - Solar Panels
Solar Electric System - Inverters
Solar Electric System - Deciding Where to Put your System
Solar Electric System - Net Metering
Energy Efficient Windows - Solar Heat Gain and U-Factor
Selecting Energy Efficient Windows
privet! by katyaelovec at 01/13/11 09:10AM Flag
http://2466.ru this good video!!!!!
(Add Comment)